INTRODUCTION
Electrical engineers are concerned with every step in the process of generation, transmission, distribution, and utilization of electrical energy. The electric utility industry is probably the largest and most complex industry in the
world. The electrical engineer who works in that industry will encounter
challenging problems in designing future power systems to deliver increasing
amounts of electrical energy in a safe, clean, and economical manner.
The objectives of this chapter are to review briefly the history of the
electric utility industry, to discuss present and future trends in electric power
systems, to describe the restructuring of the electric utility industry, and to
introduce PowerWorld Simulator—a power system analysis and simulation
software package.
1
1300 MW coal-fired power
plant (Courtesy of
American Electric Power
Company)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 1)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
CASE STUDY The following article describes the restructuring of the electric utility industry that has
been taking place in the United States and the impacts on an aging transmission
infrastructure. Independent power producers, increased competition in the generation
sector, and open access for generators to the U.S. transmission system have changed the
way the transmission system is utilized. The need for investment in new transmission and
transmission technologies, for further refinements in restructuring, and for training and
education systems to replenish the workforce are discussed [8].
The Future Beckons: Will the Electric
Power Industry Heed the Call?
CHRISTOPHER E. ROOT
Over the last four decades, the U.S. electric power
industry has undergone unprecedented change. In
the 1960s, regulated utilities generated and delivered power within a localized service area. The
decade was marked by high load growth and modest price stability. This stood in sharp contrast to
the wild increases in the price of fuel oil, focus on
energy conservation, and slow growth of the 1970s.
Utilities quickly put the brakes on generation expansion projects, switched to coal or other nonoil
fuel sources, and significantly cut back on the expansion of their networks as load growth slowed to
a crawl. During the 1980s, the economy in many
regions of the country began to rebound. The
1980s also brought the emergence of independent
power producers and the deregulation of the natural gas wholesale markets and pipelines. These developments resulted in a significant increase in natural gas transmission into the northeastern United
States and in the use of natural gas as the preferred
fuel for new generating plants.
During the last ten years, the industry in many
areas of the United States has seen increased competition in the generation sector and a fundamental
shift in the role of the nation’s electric transmission
system, with the 1996 enactment of the Federal
Energy Regulatory Commission (FERC) Order No.
888, which mandated open access for generators to
the nation’s transmission system. And while prices
for distribution and transmission of electricity remained regulated, unregulated energy commodity
markets have developed in several regions. FERC
has supported these changes with rulings leading
to the formation of independent system operators (ISOs) and regional transmission organizations (RTOs) to administer the electricity markets in several regions of the United States,
including New England, New York, the Mid-Atlantic,
the Midwest, and California.
The transmission system originally was built to
deliver power from a utility’s generator across town
to its distribution company. Today, the transmission
system is being used to deliver power across states
or entire regions. As market forces increasingly
determine the location of generation sources, the
transmission grid is being asked to play an even
more important role in markets and the reliability
of the system. In areas where markets have been
restructured, customers have begun to see significant benefits. But full delivery of restructuring’s
benefits is being impeded by an inadequate, underinvested transmission system.
If the last 30 years are any indication, the structure of the industry and the increasing demands
placed on the nation’s transmission infrastructure
and the people who operate and manage it are
likely to continue unabated. In order to meet
the challenges of the future, to continue to maintain
the stable, reliable, and efficient system we have
known for more than a century and to support the
(‘‘The Future Beckons,’’ Christopher E. Root. > 2006 IEEE.
Reprinted, with permission, from Supplement to IEEE Power
& Energy (May/June 2006) pg. 58–65)
2 CHAPTER 1 INTRODUCTION
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 2)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
continued development of efficient competitive
markets, U.S. industry leaders must address three
significant issues:
. an aging transmission system suffering from
substantial underinvestment, which is exacerbated by an out-of-date industry structure
. the need for a regulatory framework that will
spur independent investment, ownership, and
management of the nation’s grid
. an aging workforce and the need for a succession plan to ensure the existence of the
next generation of technical expertise in the
industry.
ARE WE SPENDING ENOUGH?
In areas that have restructured power markets,
substantial benefits have been delivered to customers
in the form of lower prices, greater supplier choice,
and environmental benefits, largely due to the development and operation of new, cleaner generation. There is, however, a growing recognition that
the delivery of the full value of restructuring to customers has been stalled by an inadequate transmission system that was not designed for the new demands being placed on it. In fact, investment in the
nation’s electricity infrastructure has been declining
for decades. Transmission investment has been falling
for a quarter century at an average rate of almost
US$50 million a year (in constant 2003 U.S. dollars),
though there has been a small upturn in the last few
years. Transmission investment has not kept up with
load growth or generation investment in recent
years, nor has it been sufficiently expanded to accommodate the advent of regional power markets
(see Figure 1).
CASE STUDY 3
Figure 1
Annual transmission investments by investor-owned utilities, 1975–2003 (Source: Eric Hirst, ‘‘U.S. Transmission
Capacity: Present Status and Future Prospects,’’ 2004. Graph used with permission from the Edison Electric Institute,
2004. All rights reserved)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 3)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Outlooks for future transmission development
vary, with Edison Electric Institute (EEI ) data suggesting a modest increase in expected transmission
investment and other sources forecasting a continued decline. Even assuming EEI’s projections are
realized, this level of transmission investment in the
United States is dwarfed by that of other international competitive electricity markets, as shown
in Table 1, and is expected to lag behind what is
needed.
The lack of transmission investment has led to
a high (and increasing in some areas) level of
congestion-related costs in many regions. For instance, total uplift for New England is in the range of
US$169 million per year, while locational installed
capacity prices and reliability must-run charges are
on the rise. In New York, congestion costs have increased substantially, from US$310 million in 2001 to
US$525 million in 2002, US$688 million in 2003, and
US$629 million in 2004. In PJM Interconnection
(PJM), an RTO that administers electricity markets
for all or parts of 14 states in the Northeast,
Midwest, and Mid-Atlantic, congestion costs have
continued to increase, even when adjusted to reflect
PJM’s expanding footprint into western and southern
regions.
Because regions do not currently quantify the
costs of constraints in the same way, it is difficult to
make direct comparisons from congestion data between regions. However, the magnitude and upward trend of available congestion cost data indicates a significant and growing problem that is
increasing costs to customers.
THE SYSTEM IS AGING
While we are pushing the transmission system
harder, it is not getting any younger. In the northeastern United States, the bulk transmission system
operates primarily at 345 kV. The majority of this
system originally was constructed during the 1960s
and into the early 1970s, and its substations, wires,
towers, and poles are, on average, more than 40
years old. (Figure 2 shows the age of National
Grid’s U.S. transmission structures.) While all utilities have maintenance plans in place for these systems, ever-increasing congestion levels in many
areas are making it increasingly difficult to schedule
circuit outages for routine upgrades.
The combination of aging infrastructure, increased congestion, and the lack of significant expansion in transmission capacity has led to the need
to carefully prioritize maintenance and construction, which in turn led to the evolution of the
science of asset management, which many utilities
have adopted. Asset management entails quantifying
the risks of not doing work as a means to ensure
that the highest priority work is performed. It has
significantly helped the industry in maintaining reliability. As the assets continue to age, this combination of engineering, experience, and business risk
will grow in importance to the industry. If this is not
done well, the impact on utilities in terms of reliability and asset replacement will be significant.
And while asset management techniques will
help in managing investment, the age issue undoubtedly will require substantial reinvestment at
some point to replace the installed equipment at
the end of its lifetime.
4 CHAPTER 1 INTRODUCTION
TABLE 1 Transmission investment in the United
States and in international competitive markets
Country Investment
in High Voltage
Transmission
(>230 kV)
Normalized
by Load for
2004–2008 (in
US$M/GW/year)
Number of
TransmissionOwning
Entities
New Zealand 22.0 1
England & Wales
(NGT)
16.5 1
Denmark 12.5 2
Spain 12.3 1
The Netherlands 12.0 1
Norway 9.2 1
Poland 8.6 1
Finland 7.2 1
United States 4.6 450
(based on
representative
data from EEI)
(69 in EEI)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 4)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
TECHNOLOGY WILL HAVE A ROLE
The expansion of the transmission network in the
United States will be very difficult, if not impossible, if the traditional approach of adding new
overhead lines continues. Issues of land availability,
concerns about property values, aesthetics, and
other licensing concerns make siting new lines a
difficult proposition in many areas of the United
States. New approaches to expansion will be required to improve the transmission networks of
the future.
Where new lines are the only answer, more
underground solutions will be chosen. In some
circumstances, superconducting cable will become a
viable option. There are several companies, including National Grid, installing short superconducting
lines to gain experience with this newly available
technology and solve real problems. While it is
reasonable to expect this solution to become more
prevalent, it is important to recognize that it is not
inexpensive.
Technology has an important role to play in
utilizing existing lines and transmission corridors
to increase capacity. Lightweight, high-temperature
overhead conductors are now becoming available
for line upgrades without significant tower modifications. Monitoring systems for real-time ratings
and better computer control schemes are providing
improved information to control room operators
to run the system at higher load levels. The development and common use of static var compensators for voltage and reactive control, and the general use of new solid-state equipment to solve real
problems are just around the corner and should
add a new dimension to the traditional wires and
transformers approach to addressing stability and
short-term energy storage issues.
CASE STUDY 5
Figure 2
Age of National Grid towers and poles
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 5)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
These are just a few examples of some of the exciting new technologies that will be tools for the future. It is encouraging that the development of new
and innovative solutions to existing problems continues. In the future, innovation must take a leading
role in developing solutions to transmission problems, and it will be important for the regulators to
encourage the use of new techniques and technologies. Most of these new technologies have
a higher cost than traditional solutions, which will
place increasing pressure on capital investment. It will
be important to ensure that appropriate cost recovery mechanisms are developed to address this issue.
INDUSTRY STRUCTURE
Another factor contributing to underinvestment
in the transmission system is the tremendous fragmentation that exists in the U.S. electricity industry.
There are literally hundreds of entities that own
and operate transmission. The United States has
more than 100 separate control areas and more
than 50 regulators that oversee the nation’s grid.
The patchwork of ownership and operation lies in
stark contrast to the interregional delivery demands that are being placed on the nation’s transmission infrastructure.
Federal policymakers continue to encourage
transmission owners across the nation to
join RTOs. Indeed, RTO/ISO formation was intended to occupy a central role in carrying forward
FERC’s vision of restructuring, and an extraordinary
amount of effort has been expended in making this
model work. While RTOs/ISOs take a step toward
an independent, coordinated transmission system, it
remains unclear whether they are the best longterm solution to deliver efficient transmission system operation while ensuring reliability and delivering value to customers.
Broad regional markets require policies that facilitate and encourage active grid planning, management, and the construction of transmission upgrades both for reliability and economic needs. A
strong transmission infrastructure or network platform would allow greater fuel diversity, more stable
and competitive energy prices, and the relaxation
(and perhaps ultimate removal) of administrative
mechanisms to mitigate market power. This would
also allow for common asset management approaches to the transmission system. The creation
of independent transmission companies (ITCs), i.e.,
companies that focus on the investment in and operation of transmission independent of generation
interests, would be a key institutional step toward
an industry structure that appropriately views
transmission as a facilitator of robust competitive
electricity markets. ITCs recognize transmission as
an enabler of competitive electricity markets. Policies that provide a more prominent role for such
companies would align the interests of transmission
owners/operators with those of customers, permitting the development of well-designed and enduring
power markets that perform the function of any
market, namely, to drive the efficient allocation of
resources for the benefit of customers. In its policy
statement released in June 2005, FERC reiterated its
commitment to ITC formation to support improving
the performance and efficiency of the grid.
Having no interest in financial outcomes within
a power market, the ITC’s goal is to deliver maximum value to customers through transmission
operation and investment. With appropriate incentives, ITCs will pursue opportunities to leverage
relatively small expenditures on transmission construction and management to create a healthy market and provide larger savings in the supply portion
of customer’s bills. They also offer benefits over
nonprofit RTO/ISO models, where the incentives
for efficient operation and investment may be less
focused.
An ideal industry structure would permit ITCs
to own, operate, and manage transmission assets
over a wide area. This would allow ITCs to access
economies of scale in asset investment, planning, and
operations to increase throughout and enhance reliability in the most cost-effective manner. This structure would also avoid ownership fragmentation
within a single market, which is a key obstacle to
the introduction of performance-based rates that
benefit customers by aligning the interests of transmission companies and customers in reducing congestion. This approach to ‘‘horizontal integration’’ of
6 CHAPTER 1 INTRODUCTION
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 6)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
the transmission sector under a single regulated
for-profit entity is key to establishing an industry
structure that recognizes the transmission system
as a market enabler and provider of infrastructure
to support effective competitive markets. Market
administration would be contracted out to another
(potentially nonprofit) entity while generators, other
suppliers, demand response providers, and load
serving entities (LSEs) would all compete and innovate in fully functioning markets, delivering stillincreased efficiency and more choices for customers.
REGULATORY ISSUES
The industry clearly shoulders much of the responsibility for determining its own future and for taking
the steps necessary to ensure the robustness of the
nation’s transmission system. However, the industry
also operates within an environment governed by
substantial regulatory controls. Therefore, policymakers also will have a significant role in helping
to remove the obstacles to the delivery of the full
benefits of industry restructuring to customers. In
order to ensure adequate transmission investment
and the expansion of the system as appropriate, the
following policy issues must be addressed:
. Regional planning: Because the transmission system is an integrated network, planning for system needs should occur on a regional basis.
Regional planning recognizes that transmission
investment and the benefits transmission can
deliver to customers are regional in nature
rather than bounded by state or service area
lines. Meaningful regional planning processes
also take into account the fact that transmission
provides both reliability and economic benefits.
Comprehensive planning processes provide for
mechanisms to pursue regulated transmission
solutions for reliability and economic needs in
the event that the market fails to respond or is
identified as unlikely to respond to these needs
in a timely manner. In areas where regional
system planning processes have been implemented, such as New England and PJM,
progress is being made towards identifying and
building transmission projects that will address
regional needs and do so in a way that is cost
effective for customers.
. Cost recovery and allocation: Comprehensive regional planning processes that identify needed
transmission projects must be accompanied by
cost recovery and allocation mechanisms that
recognize the broad benefits of transmission
and its role in supporting and enabling regional
electricity markets. Mechanisms that allocate
the costs of transmission investment broadly
view transmission as the regional market enabler it is and should be, provide greater certainty and reduce delays in cost recovery, and,
thus, remove obstacles to provide further
incentives for the owners and operators of
transmission to make such investment.
. Certainty of rate recovery and state cooperation: It
is critical that transmission owners are assured
certain and adequate rate recovery under a
regional planning process. Independent administration of the planning processes will assure
that transmission enhancements required for
reliability and market efficiency do not unduly
burden retail customers with additional costs.
FERC and the states must work together to
provide for certainty in rate recovery from
ultimate customers through federal and state
jurisdictional rates.
. Incentives to encourage transmission investment,
independence, and consolidation: At a time when
a significant increase in transmission investment
is needed to ensure reliability, produce an adequate platform for competitive power markets
and regional electricity commerce, and to promote fuel diversity and renewable sources of
supply, incentives not only for investment but
also for independence and consolidation of
transmission are needed and warranted. Incentives should be designed to promote transmission organizations that acknowledge the
benefits to customers of varying degrees of
transmission independence and reward that independence accordingly. These incentives may
take the form of enhanced rates of return or
other financial incentives for assets managed,
operated, and/or owned by an ITC.
CASE STUDY 7
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 7)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
The debate about transmission regulation will
continue. Ultimately, having the correct mixture of
incentives and reliability standards will be a critical
factor that will determine whether or not the nation’s grid can successfully tie markets together and
improve the overall reliability of the bulk transmission system in the United States. The future transmission system must be able to meet the needs of
customers reliably and support competitive markets
that provide them with electricity efficiently. Failure
to invest in the transmission system now will mean
an increased likelihood of reduced reliability and
higher costs to customers in the future.
WORKFORCE OF THE FUTURE
Clearly, the nation’s transmission system will need
considerable investment and physical work due to
age, growth of the use of electricity, changing markets, and how the networks are used. As previously
noted, this will lead to a required significant increase in capital spending. But another critical resource is beginning to become a concern to many in
the industry, specifically the continued availability of
qualified power system engineers.
Utility executives polled by the Electric Power
Research Institute in 2003 estimated that 50% of
the technical workforce will reach retirement in the
next 5–10 years. This puts the average age near 50,
with many utilities still hiring just a few college
graduates each year. Looking a few years ahead, at
the same time when a significant number of power
engineers will be considering retirement, the need
for them will be significantly increasing. The supply
of power engineers will have to be great enough to
replace the large numbers of those retiring in addition to the number required to respond to the anticipated increase in transmission capital spending.
Today, the number of universities offering power
engineering programs has decreased. Some universities, such as Rensselaer Polytechnic Institute,
no longer have separate power system engineering
departments. According to the IEEE, the number of
power system engineering graduates has dropped
from approximately 2,000 per year in the 1980s
to 500 today. Overall, the number of engineering
graduates has dropped 50% in the last 15 years.
Turning this situation around will require a longterm effort by many groups working together,
including utilities, consultants, manufacturers, universities, and groups such as the IEEE Power Engineering Society (PES).
Part of the challenge is that utilities are competing for engineering students against other industries, such as telecommunications or computer
software development, that are perceived as being
more glamorous or more hip than the power industry and have no problem attracting large numbers of new engineers.
For the most part, the power industry has not
done a great job of selling itself. Too often, headlines
focus on negatives such as rate increases, power
outages, and community relations issues related to a
proposed new generation plant or transmission line.
To a large extent, the industry also has become a
victim of its own success by delivering electricity so
reliably that the public generally takes it for granted,
which makes the good news more difficult to tell. It
is incumbent upon the industry to take a much more
proactive role in helping its public—including talented engineering students—understand the dedication, commitment, ingenuity, and innovation that is
required to keep the nation’s electricity system
humming. PES can play an important role in this.
On a related note, as the industry continues to
develop new, innovative technologies, they should
be documented and showcased to help generate
excitement about the industry among college-age
engineers and help attract them to power system
engineering.
The utilities, consultants, and manufacturers must
strengthen their relationships with strong technical
institutions to continue increasing support for electrical engineering departments to offer power systems classes at the undergraduate level. In some
cases, this may even require underwriting a class.
Experience at National Grid has shown that when
support for a class is guaranteed, the number of
students who sign up typically is greater than expected. The industry needs to further support these
8 CHAPTER 1 INTRODUCTION
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 8)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
efforts by offering presentations to students on the
complexity of the power system, real problems that
need to be solved, and the impact that a reliable,
cost-efficient power system has on society. Sponsoring more student internships and research projects
will introduce additional students and faculty to the
unique challenges of the industry. In the future, the
industry will have to hire more nonpower engineers
and train them in the specifics of power system engineering or rely on hiring from overseas.
Finally, the industry needs to cultivate relationships with universities to assist in developing professors who are knowledgeable about the industry.
This can take the form of research work, consulting, and teaching custom programs for the industry.
National Grid has developed relationships with
several northeastern U.S. institutions that are offering courses for graduate engineers who may not
have power backgrounds. The courses can be offered online, at the university, or on site at the utility.
This problem will only get worse if industry
leaders do not work together to resolve it. The industry’s future depends on its ability to anticipate
what lies ahead and the development of the necessary human resources to meet the challenges.
CONCLUSIONS
The electric transmission system plays a critical role
in the lives of the people of the United States. It is
an ever-changing system both in physical terms and
how it is operated and regulated. These changes
must be recognized and actions developed accordingly. Since the industry is made up of many organizations that share the system, it can be difficult to
agree on action plans.
There are a few points on which all can agree.
The first is that the transmission assets continue to
get older and investment is not keeping up with
needs when looking over a future horizon. The issue will only get worse as more lines and substations exceed the 50-year age mark. Technology
development and application undoubtedly will increase as engineers look for new and creative ways
to combat the congestion issues and increased
electrical demand—and new overhead transmission
lines will be only one of the solutions considered.
The second is that it will be important for further refinement in the restructuring of the industry
to occur. The changes made since the late 1990s
have delivered benefits to customers in the Northeast in the form of lower energy costs and access
to greater competitive electric markets. Regulators
and policymakers should recognize that independently owned, operated, managed, and widely
planned networks are important to solving future
problems most efficiently. Having a reliable, regional, uncongested transmission system will enable
a healthy competitive marketplace.
The last, but certainly not least, concern is with
the industry’s future workforce. Over the last year,
there has been significant discussion of the issue,
but it will take a considerable effort by many to
guide the future workforce into a position of appreciating the electricity industry and desiring to
enter it and to ensure that the training and education systems are in place to develop the new engineers who will be required to upgrade and maintain the electric power system.
The industry has many challenges, but it also has
great resources and a good reputation. Through the
efforts of many and by working together through
organizations such as PES, the industry can move
forward to the benefit of the public and the United
States as a whole.
ACKNOWLEDGMENTS
The following National Grid staff members contributed to this article: Jackie Barry, manager,
transmission communications; Janet Gail Besser,
vice president, regulatory affairs, U.S. Transmission;
Mary Ellen Paravalos, director, regulatory policy,
U.S. Transmission; Joseph Rossignoli, principal analyst, regulatory policy, U.S. Transmission.
FOR FURTHER READING
National Grid, ‘‘Transmission: The critical link. Delivering the promise of industry restructuring to
CASE STUDY 9
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 9)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
customers,’’ June 2005 [Online]. Available: http://
www.nationalgridus.com/transmission_the_critical_
link/
E. Hirst, ‘‘U.S. transmission capacity: Present
status and future prospects,’’ Edison Electric Inst.
and U.S. Dept. Energy, Aug. 2004.
Consumer Energy Council of America, ‘‘Keeping the power flowing: Ensuring a strong transmission system to support consumer needs for
cost-effectiveness, security and reliability,’’ Jan. 2005
[Online]. Available: http://www.cecarf.org
‘‘Electricity sector framework for the future,’’
Electric Power Res. Inst., Aug. 2003.
J. R. Borland, ‘‘A shortage of talent,’’ Transmission
Distribution World, Sep. 1, 2002.
BIOGRAPHY
Christopher E. Root is senior vice president of
Transmission and Distribution (T&D) Technical Services of National Grid’s U.S. business. He oversees
the T&D technical services organization in New
England and New York. He received a B.S. in electrical engineering from Northeastern University,
Massachusetts, and a master’s in engineering from
Rensselaer Polytechnic Institute, New York. In
1997, he completed the Program for Management
Development from the Harvard University Graduate School of Business. He is a registered Professional Engineer in the states of Massachusetts and
Rhode Island and is a Senior Member of the IEEE.
1.1
HISTORY OF ELECTRIC POWER SYSTEMS
In 1878, Thomas A. Edison began work on the electric light and formulated
the concept of a centrally located power station with distributed lighting
serving a surrounding area. He perfected his light by October 1879, and the
opening of his historic Pearl Street Station in New York City on September
4, 1882, marked the beginning of the electric utility industry (see Figure 1.1).
At Pearl Street, dc generators, then called dynamos, were driven by steam
engines to supply an initial load of 30 kW for 110-V incandescent lighting to
59 customers in a one-square-mile area. From this beginning in 1882 through
1972, the electric utility industry grew at a remarkable pace—a growth based
on continuous reductions in the price of electricity due primarily to technological acomplishment and creative engineering.
The introduction of the practical dc motor by Sprague Electric, as
well as the growth of incandescent lighting, promoted the expansion of
Edison’s dc systems. The development of three-wire 220-V dc systems allowed load to increase somewhat, but as transmission distances and loads
continued to increase, voltage problems were encountered. These limitations of maximum distance and load were overcome in 1885 by William
Stanley’s development of a commercially practical transformer. Stanley
installed an ac distribution system in Great Barrington, Massachusetts, to
supply 150 lamps. With the transformer, the ability to transmit power at
high voltage with corresponding lower current and lower line-voltage
drops made ac more attractive than dc. The first single-phase ac line in
the United States operated in 1889 in Oregon, between Oregon City and
Portland—21 km at 4 kV.
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 10)
10 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
The growth of ac systems was further encouraged in 1888 when Nikola Tesla presented a paper at a meeting of the American Institute of Electrical Engineers describing two-phase induction and synchronous motors, which made evident the advantages of polyphase versus single-phase systems. The first threephase line in Germany became operational in 1891, transmitting power 179 km
at 12 kV. The first three-phase line in the United States (in California) became
operational in 1893, transmitting power 12 km at 2.3 kV. The three-phase induction motor conceived by Tesla went on to become the workhorse of the industry.
In the same year that Edison’s steam-driven generators were inaugurated,
a waterwheel-driven generator was installed in Appleton, Wisconsin. Since
then, most electric energy has been generated in steam-powered and in waterpowered (called hydro) turbine plants. Today, steam turbines account for more
than 85% of U.S. electric energy generation, whereas hydro turbines account
for about 6%. Gas turbines are used in some cases to meet peak loads. Also,
the addition of wind turbines into the bulk power system is expected to grow
considerably in the near future.
FIGURE 1.1 Milestones of the early electric utility industry [1] (H.M. Rustebakke et al., Electric
Utility Systems Practice, 4th Ed. (New York: Wiley, 1983). Reprinted with
permission of John Wiley & Sons, Inc. Photos courtesy of Westinghouse Historical
Collection)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 11)
SECTION 1.1 HISTORY OF ELECTRIC POWER SYSTEMS 11
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Steam plants are fueled primarily by coal, gas, oil, and uranium. Of
these, coal is the most widely used fuel in the United States due to its abundance in the country. Although many of these coal-fueled power plants were
converted to oil during the early 1970s, that trend has been reversed back to
coal since the 1973–74 oil embargo, which caused an oil shortage and created
a national desire to reduce dependency on foreign oil. In 2008, approximately
48% of electricity in the United States was generated from coal [2].
In 1957, nuclear units with 90-MW steam-turbine capacity, fueled
by uranium, were installed, and today nuclear units with 1312-MW steamturbine capacity are in service. In 2008, approximately 20% of electricity in
the United States was generated from uranium from 104 nuclear power
plants. However, the growth of nuclear capacity in the United States has
been halted by rising construction costs, licensing delays, and public opinion.
Although there are no emissions associated with nuclear power generation,
there are safety issues and environmental issues, such as the disposal of used
nuclear fuel and the impact of heated cooling-tower water on aquatic habitats. Future technologies for nuclear power are concentrated on safety and
environmental issues [2, 3].
Starting in the 1990s, the choice of fuel for new power plants in the
United States has been natural gas due to its availability and low cost as well
as the higher e‰ciency, lower emissions, shorter construction-lead times,
safety, and lack of controversy associated with power plants that use natural
gas. Natural gas is used to generate electricity by the following processes:
(1) gas combustion turbines use natural gas directly to fire the turbine;
(2) steam turbines burn natural gas to create steam in a boiler, which is then
run through the steam turbine; (3) combined cycle units use a gas combustion
turbine by burning natural gas, and the hot exhaust gases from the combustion turbine are used to boil water that operates a steam turbine; and (4) fuel
cells powered by natural gas generate electricity using electrochemical reactions by passing streams of natural gas and oxidants over electrodes that
are separated by an electrolyte. In 2008, approximately 21% of electricity in
the United States was generated from natural gas [2, 3].
In 2008, in the United States, approximately 9% of electricity was generated by renewable sources and 1% by oil [2, 3]. Renewable sources include
conventional hydroelectric (water power), geothermal, wood, wood waste, all
municipal waste, landfill gas, other biomass, solar, and wind power. Renewable sources of energy cannot be ignored, but they are not expected to supply
a large percentage of the world’s future energy needs. On the other hand, nuclear fusion energy just may. Substantial research e¤orts have shown nuclear
fusion energy to be a promising technology for producing safe, pollution-free,
and economical electric energy later in the 21st century and beyond. The fuel
consumed in a nuclear fusion reaction is deuterium, of which a virtually inexhaustible supply is present in seawater.
The early ac systems operated at various frequencies including 25, 50,
60, and 133 Hz. In 1891, it was proposed that 60 Hz be the standard frequency in the United States. In 1893, 25-Hz systems were introduced with the
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 12)
12 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
synchronous converter. However, these systems were used primarily for railroad electrification (and many are now retired) because they had the disadvantage of causing incandescent lights to flicker. In California, the Los
Angeles Department of Power and Water operated at 50 Hz, but converted
to 60 Hz when power from the Hoover Dam became operational in 1937. In
1949, Southern California Edison also converted from 50 to 60 Hz. Today,
the two standard frequencies for generation, transmission, and distribution of
electric power in the world are 60 Hz (in the United States, Canada, Japan,
Brazil) and 50 Hz (in Europe, the former Soviet republics, South America
except Brazil, and India). The advantage of 60-Hz systems is that generators,
motors, and transformers in these systems are generally smaller than 50-Hz
equipment with the same ratings. The advantage of 50-Hz systems is that
transmission lines and transformers have smaller reactances at 50 Hz than at
60 Hz.
As shown in Figure 1.2, the rate of growth of electric energy in the
United States was approximately 7% per year from 1902 to 1972. This corresponds to a doubling of electric energy consumption every 10 years over the
70-year period. In other words, every 10 years the industry installed a new
electric system equal in energy-producing capacity to the total of what it had
built since the industry began. The annual growth rate slowed after the oil
embargo of 1973–74. Kilowatt-hour consumption in the United States increased by 3.4% per year from 1972 to 1980, and by 2.1% per year from 1980
to 2008.
Along with increases in load growth, there have been continuing increases in the size of generating units (Table 1.1). The principal incentive to
build larger units has been economy of scale—that is, a reduction in installed
cost per kilowatt of capacity for larger units. However, there have also
been steady improvements in generation e‰ciency. For example, in 1934 the
average heat rate for steam generation in the U.S. electric industry was
FIGURE 1.2
Growth of U.S. electric
energy consumption
[1, 2, 3, 5] (H. M.
Rustebakke et al.,
Electric Utility Systems
Practice, 4th ed. (New
York: Wiley, 1983); U.S.
Energy Information
Administration, Existing
Capacity by Energy
Source—2008,
www.eia.gov; U.S.
Energy Information
Administration, Annual
Energy Outlook 2010
Early Release Overview,
www.eia.gov; M.P.
Bahrman and B.K.
Johnson, ‘‘The ABCs of
HVDC Transmission
Technologies,’’ IEEE
Power & Energy
Magazine, 5, 2 (March/
April 2007), pp. 33–44)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 13)
SECTION 1.1 HISTORY OF ELECTRIC POWER SYSTEMS 13
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
17,950 BTU/kWh, which corresponds to 19% e‰ciency. By 1991, the average
heat rate was 10,367 BTU/kWh, which corresponds to 33% e‰ciency. These
improvements in thermal e‰ciency due to increases in unit size and in steam
temperature and pressure, as well as to the use of steam reheat, have resulted
in savings in fuel costs and overall operating costs.
There have been continuing increases, too, in transmission voltages
(Table 1.2). From Edison’s 220-V three-wire dc grid to 4-kV single-phase and
2.3-kV three-phase transmission, ac transmission voltages in the United
States have risen progressively to 150, 230, 345, 500, and now 765 kV. And
ultra-high voltages (UHV ) above 1000 kV are now being studied. The incentives for increasing transmission voltages have been: (1) increases in
transmission distance and transmission capacity, (2) smaller line-voltage
drops, (3) reduced line losses, (4) reduced right-of-way requirements per MW
transfer, and (5) lower capital and operating costs of transmission. Today,
one 765-kV three-phase line can transmit thousands of megawatts over hundreds of kilometers.
The technological developments that have occurred in conjunction with
ac transmission, including developments in insulation, protection, and control, are in themselves important. The following examples are noteworthy:
1. The suspension insulator
2. The high-speed relay system, currently capable of detecting shortcircuit currents within one cycle (0.017 s)
3. High-speed, extra-high-voltage (EHV ) circuit breakers, capable of
interrupting up to 63-kA three-phase short-circuit currents within
two cycles (0.033 s)
4. High-speed reclosure of EHV lines, which enables automatic return to service within a fraction of a second after a fault has been
cleared
5. The EHV surge arrester, which provides protection against transient
overvoltages due to lightning strikes and line-switching operations
TABLE 1.2
History of increases in
three-phase transmission
voltages in the United
States [1] (H. M.
Rustebakke et al.,
Electric Utility Systems
Practice, 4th Ed. (New
York: Wiley, 1983).
Reprinted with
permission of John
Wiley & Sons, Inc.)
Voltage
(kV)
Year of
Installation
2.3 1893
44 1897
150 1913
165 1922
230 1923
287 1935
345 1953
500 1965
765 1969
TABLE 1.1
Growth of generator
sizes in the United
States [1] (H. M.
Rustebakke et al.,
Electric Utility Systems
Practice, 4th Ed. (New
York: Wiley, 1983).
Reprinted with
permission of John
Wiley & Sons, Inc.)
Hydroelectric Generators
Generators Driven by Single-Shaft,
3600 r/min Fossil-Fueled Steam Turbines
Size
(MVA)
Year of
Installation
Size
(MVA)
Year of
Installation
4 1895 5 1914
108 1941 50 1937
158 1966 216 1953
232 1973 506 1963
615 1975 907 1969
718 1978 1120 1974
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 14)
14 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
6. Power-line carrier, microwave, and fiber optics as communication
mechanisms for protecting, controlling, and metering transmission
lines
7. The principle of insulation coordination applied to the design of an
entire transmission system
8. Energy control centers with supervisory control and data acquisition (SCADA) and with automatic generation control (AGC) for
centralized computer monitoring and control of generation, transmission, and distribution
9. Automated distribution features, including advanced metering infrastructure (AMI), reclosers and remotely controlled sectionalizing
switches with fault-indicating capability, along with automated
mapping/facilities management (AM/FM) and geographic information systems (GIS) for quick isolation and identification of outages
and for rapid restoration of customer services
10. Digital relays capable of circuit breaker control, data logging, fault
locating, self-checking, fault analysis, remote query, and relay event
monitoring/recording.
In 1954, the first modern high-voltage dc (HVDC) transmission line was
put into operation in Sweden between Vastervik and the island of Gotland in
the Baltic sea; it operated at 100 kV for a distance of 100 km. The first HVDC
line in the United States was the G400-kV (now G500 kV), 1360-km Pacific
Intertie line installed between Oregon and California in 1970. As of 2008,
seven other HVDC lines up to 500 kV and eleven back-to-back ac-dc links had
been installed in the United States, and a total of 57 HVDC lines up to 600 kV
had been installed worldwide [4].
For an HVDC line embedded in an ac system, solid-state converters at
both ends of the dc line operate as rectifiers and inverters. Since the cost of an
HVDC transmission line is less than that of an ac line with the same capacity, the additional cost of converters for dc transmission is o¤set when the
line is long enough. Studies have shown that overhead HVDC transmission is
economical in the United States for transmission distances longer than about
600 km. However, HVDC also has the advantage that it may be the only
feasible method to:
1. interconnect two asynchronous networks;
2. utilize long underground or underwater cable circuits;
3. bypass network congestion;
4. reduce fault currents;
5. share utility rights-of-way without degrading reliability; and
6. mitigate environmental concerns [5].
In the United States, electric utilities grew first as isolated systems, with
new ones continuously starting up throughout the country. Gradually, however,
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 15)
SECTION 1.1 HISTORY OF ELECTRIC POWER SYSTEMS 15
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
FIGURE 1.3 Major transmission in the United States—2000 [8] (
( North American Electric Reliability Council. Reprinted with permission)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 16)
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
neighboring electric utilities began to interconnect, to operate in parallel. This
improved both reliability and economy. Figure 1.3 shows major 230-kV and
higher-voltage, interconnected transmission in the United States in 2000. An interconnected system has many advantages. An interconnected utility can draw
upon another’s rotating generator reserves during a time of need (such as a
sudden generator outage or load increase), thereby maintaining continuity of
service, increasing reliability, and reducing the total number of generators that
need to be kept running under no-load conditions. Also, interconnected utilities
can schedule power transfers during normal periods to take advantage of
energy-cost di¤erences in respective areas, load diversity, time zone di¤erences,
and seasonal conditions. For example, utilities whose generation is primarily
hydro can supply low-cost power during high-water periods in spring/summer,
and can receive power from the interconnection during low-water periods in
fall/winter. Interconnections also allow shared ownership of larger, more e‰-
cient generating units.
While sharing the benefits of interconnected operation, each utility is
obligated to help neighbors who are in trouble, to maintain scheduled intertie transfers during normal periods, and to participate in system frequency
regulation.
In addition to the benefits/obligations of interconnected operation,
there are disadvantages. Interconnections, for example, have increased fault
currents that occur during short circuits, thus requiring the use of circuit
breakers with higher interrupting capability. Furthermore, although overall
system reliability and economy have improved dramatically through interconnection, there is a remote possibility that an initial disturbance may lead
to a regional blackout, such as the one that occurred in August 2003 in the
northeastern United States and Canada.
1.2
PRESENT AND FUTURE TRENDS
Present trends indicate that the United States is becoming more electrified
as it shifts away from a dependence on the direct use of fossil fuels. The electric power industry advances economic growth, promotes business development and expansion, provides solid employment opportunities, enhances the
quality of life for its users, and powers the world. Increasing electrification in
the United States is evidenced in part by the ongoing digital revolution. Today the United States electric power industry is a robust, $342-billion-plus
industry that employs nearly 400,000 workers. In the United States economy,
the industry represents 3% of real gross domestic product (GDP) [6].
As shown in Figure 1.2, the growth rate in the use of electricity in the
United States is projected to increase by about 1% per year from 2008 to
2030 [2]. Although electricity forecasts for the next ten years are based on
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 17)
SECTION 1.2 PRESENT AND FUTURE TRENDS 17
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
economic and social factors that are subject to change, 1% annual growth
rate is considered necessary to generate the GDP anticipated over that period. Variations in longer-term forecasts of 0.5 to 1.5% annual growth from
2008 to 2030 are based on low-to-high ranges in economic growth. Following
a recent rapid decline in natural gas prices, average delivered electricity prices
are projected to fall sharply from 9.8 cents per kilowatt-hour in 2008 to
8.6 cents per kilowatt-hour in 2011 and remain below 9.0 cents per kilowatthour through 2020 [2, 3].
Figure 1.4 shows the percentages of various fuels used to meet U.S.
electric energy requirements for 2008 and those projected for 2015 and 2030.
Several trends are apparent in the chart. One is the continuing use of coal.
This trend is due primarily to the large amount of U.S. coal reserves, which,
according to some estimates, is su‰cient to meet U.S. energy needs for the
next 500 years. Implementation of public policies that have been proposed to
reduce carbon dioxide emissions and air pollution could reverse this trend.
Another trend is the continuing consumption of natural gas in the long term
with gas-fired turbines that are safe, clean, and more e‰cient than competing technologies. Regulatory policies to lower greenhouse gas emissions
could accelerate a switchover from coal to gas, but that would require
an increasing supply of deliverable natural gas. A slight percentage decrease
in nuclear fuel consumption is also evident. No new nuclear plant has been
(1%) 2008
= coal = gas = oil = nuclear = Renewable Sources
2015
(forecast)
2030
(forecast)
(9%)
(20%)
(21%)
(48%)
(1%)
(15%)
(19%)
(16%)
(48%)
(100%)
(100%)
(1%)
(17%)
(18%)
(20%)
(44%)
(100%)
4.1 × 1012 kWh
4.3 × 1012 kWh
5.0 × 1012 kWh
2.00
0.88
0.80
0.37
0.05
2.04
0.69
0.83
0.86
0.05
2.21
1.02
0.89
0.85
0.05
Renewable sources include conventional hydroelectric, geothermal, wood, wood waste,
all municipal waste, landfill gas, other biomass, solar, and wind power
FIGURE 1.4
Electric energy
generation in the United
States, by principal fuel
types [2, 3] (U.S. Energy
Information
Administration, Existing
Capacity by Energy
Source—2008,
www.eia.gov; U.S.
Energy Information
Administration, Annual
Energy Outlook 2010
Early Release Overview,
www.eia.gov)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 18)
18 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
ordered in the United States for more than 30 years. The projected growth
from 0:80 ! 1012 kWh in 2008 to 0:89 ! 1012 kWh in 2030 in nuclear generation is based on uprates at existing plants and some new nuclear capacity that
is cost competitive. Safety concerns will require passive or inherently safe reactor designs with standardized, modular construction of nuclear units. Also
shown in Figure 1.4 is an accelerating increase in electricity generation from
renewable resources in response to federal subsidies supported by many state
requirements for renewable generation.
Figure 1.5 shows the 2008 and projected 2015 U.S. generating capability by principal fuel type. As shown, total U.S. generating capacity is projected to reach 1,069 GW (1 GW = 1000 MW) by the year 2015. This represents a 0.8% annual projected growth in generating capacity, which is slightly
above the 0.7% annual projected growth in electric energy production. The
projected increase in generating capacity together with lowered load forecasts
have contributed to generally improved generating capacity reserve margins
for most of the United States and North America [2, 3, 7].
As of 2008, there were 365,058 circuit miles of existing transmission
(above 100 kV) in the United States, with an additional 31,416 circuit miles
(already under construction, planned, and conceptual) projected for the tenyear period from 2008 to 2018. The North American Electric Reliability
Council (NERC) has identified bulk power system reliability and the integration of variable renewable generation (particularly wind and solar generation)
1,010 GW
1,069 GW
313
325
446
105
193
457
101
139
(100%)
(31%)
(45%)
(10%)
(14%)
(100%)
(30%)
(42%)
(10%)
(18%)
2008 2015
(forecast)
= coal = gas/oil = nuclear = Renewable sources
Net Summer Capacities
Renewable sources include conventional & pumped storage hydroelectric, geothermal, wood,
wood waste, all municipal waste, landfill gas, other biomass, solar, and wind power
FIGURE 1.5
Installed generating
capability in the United
States by principal fuel
types [2] (U.S. Energy
Information
Administration, Existing
Capacity by Energy
Source—2008,
www.eia.gov)
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 19)
SECTION 1.2 PRESENT AND FUTURE TRENDS 19
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
as the predominant reasons for projected transmission additions and upgrades. NERC has concluded that while recent progress has been made in the
development of transmission, much work will be required to ensure that
planned and conceptual transmission is sited and built. NERC also concludes
that significant transmission will be required to ‘‘unlock’’ projected renewable
generation resources. Without this transmission, the integration of variable
generation resources could be limited [7].
Siting of new bulk power transmission lines has unique challenges due
to their high visibility, their span through multiple states, and potentially the
amount of coordination and cooperation required among multiple regulating
agencies and authorities. A recent court decision to limit the Federal Energy
Regulatory Commission’s (FERC’s) siting authority will lengthen the permit
issuing process and cause new transmission projects, particularly multiplestate or regional projects from moving forward in timely manner. This creates a potential transmission congestion issue and challenges the economic
viability of new generation projects [7].
Growth in distribution construction roughly correlates with growth in
electric energy construction. During the last two decades, many U.S. utilities
converted older 2.4-, 4.1-, and 5-kV primary distribution systems to 12 or
15 kV. The 15-kV voltage class is widely preferred by U.S. utilities for new
installations; 25 kV, 34.5 kV, and higher primary distribution voltages are
also utilized. Secondary distribution reduces the voltage for utilization
by commercial and residential customers. Common secondary distribution
voltages in the United States are 240/120 V, single-phase, three-wire; 208Y/
120 V, three-phase, four-wire; and 480Y/277 V, three-phase, four-wire.
Transmission and distribution grids in the United States as well as other
industrialized countries are aging and being stressed by operational uncertainties and challenges never envisioned when they were developed many
decades ago. There is a growing consensus in the power industry and among
many governments that smart grid technology is the answer to the uncertainties
and challenges. A smart grid is characterized by the follolwing attributes:
1. Self-healing from power system disturbances;
2. Enables active participation by consumers in demand response;
3. Operates resiliently against both physical and cyber attacks;
4. Provides quality power that meets 21st century needs;
5. Accommodates all generation and energy storage technologies;
6. Enables new products, services, and markets; and
7. Optimizes asset utilization and operating e‰ciency.
The objective of a smart grid is to provide reliable, high-quality electric
power to digital societies in an environmentally friendly and sustainable
manner [9].
Utility executives polled by the Electric Power Research Institute (EPRI)
in 2003 estimated that 50% of the electric-utility technical workforce in the
United States will reach retirement in the next five to ten years. And according
to the Institute of Electrical and Electronics Engineers (IEEE), the number of
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 20)
20 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
U.S. power system engineering graduates has dropped from approximately
2,000 per year in the 1980s to 500 in 2006. The continuing availability of qualified power system engineers is a critical resource to ensure that transmission and
distribution systems are maintained and operated e‰ciently and reliably [8].
1.3
ELECTRIC UTILITY INDUSTRY STRUCTURE
The case study at the beginning of this chapter describes the restructuring of
the electric utility industry that has been ongoing in the United States. The
previous structure of large, vertically integrated monopolies that existed until
the last decade of the twentieth century is being replaced by a horizontal
structure with generating companies, transmission companies, and distribution companies as separate business facilities.
In 1992, the United States Congress passed the Energy Policy Act,
which has shifted and continues to further shift regulatory power from the
state level to the federal level. The 1992 Energy Policy Act mandates the
Federal Energy Regulatory Commission (FERC) to ensure that adequate
transmission and distribution access is available to Exempt Wholesale Generators (EWGs) and nonutility generation (NUG). In 1996, FERC issued the
‘‘MegaRule,’’ which regulates Transmission Open Access (TOA).
TOA was mandated in order to facilitate competition in wholesale generation. As a result, a broad range of Independent Power Producers (IPPs)
and cogenerators now submit bids and compete in energy markets to match
electric energy supply and demand. In the future, the retail structure of power
distribution may resemble the existing structure of the telephone industry;
that is, consumers would choose which generator to buy power from. Also,
with demand-side metering, consumers would know the retail price of electric
energy at any given time and choose when to purchase it.
Overall system reliability has become a major concern as the electric
utility industry adapts to the new horizontal structure. The North American
Electric Reliability Council (NERC), which was created after the 1965 Northeast blackout, is responsible for maintaining system standards and reliability.
NERC coordinates its e¤orts with FERC and other organizations such as the
Edison Electric Institute (EEI ) [10].
As shown in Figure 1.3, the transmission system in North America is
interconnected in a large power grid known as the North American Power
Systems Interconnection. NERC divides this grid into ten geographic regions
known as coordinating councils (such as WSCC, the Western Systems Coordinating Council) or power pools (such as MAPP, the Mid-Continent Area
Power Pool). The councils or pools consist of several neighboring utility
companies that jointly perform regional planning studies and operate jointly
to schedule generation.
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 21)
SECTION 1.3 ELECTRIC UTILITY INDUSTRY STRUCTURE 21
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
The basic premise of TOA is that transmission owners treat all transmission users on a nondiscriminatory and comparable basis. In December
1999, FERC issued Order 2000, which calls for companies owning transmission systems to put transmission systems under the control of Regional
Transmission Organizations (RTOs). Several of the NERC regions have
either established Independent System Operators (ISOs) or planned for ISOs
to operate the transmission system and facilitate transmission services.
Maintenance of the transmission system remains the responsibility of the
transmission owners.
At the time of the August 14, 2003 blackout in the northeastern United
States and Canada, NERC reliability standards were voluntary. In August
2005, the U.S. Federal government passed the Energy Policy Act of 2005,
which authorizes the creation of an electric reliability organization (ERO)
with the statutory authority to enforce compliance with reliability standards
among all market participants. As of June 18, 2007, FERC granted NERC
the legal authority to enforce reliability standards with all users, owners, and
operators of the bulk power system in the United States, and made compliance
with those standards mandatory and enforceable. Reliability standards are also
mandatory and enforceable in Ontario and New Brunswick, and NERC is
seeking to achieve comparable results in the other Canadian provinces.
The objectives of electric utility restructuring are to increase competition, decrease regulation, and in the long run lower consumer prices. There is
a concern that the benefits from breaking up the old vertically integrated
utilities will be unrealized if the new unbundled generation and transmission
companies are able to exert market power. Market power refers to the ability
of one seller or group of sellers to maintain prices above competitive levels
for a significant period of time, which could be done via collusion or by taking
advantage of operational anomalies that create and exploit transmission congestion. Market power can be eliminated by independent supervision of generation and transmission companies, by ensuring that there are an ample number
of generation companies, by eliminating transmission congestion, and by creating a truly competitive market, where the spot price at each node (bus) in the
transmission system equals the marginal cost of providing energy at that node,
where the energy provider is any generator bidding into the system [11].
1.4
COMPUTERS IN POWER SYSTEM ENGINEERING
As electric utilities have grown in size and the number of interconnections has
increased, planning for future expansion has become increasingly complex.
The increasing cost of additions and modifications has made it imperative
that utilities consider a range of design options, and perform detailed studies of
the e¤ects on the system of each option, based on a number of assumptions:
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 22)
22 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
normal and abnormal operating conditions, peak and o¤-peak loadings, and
present and future years of operation. A large volume of network data must
also be collected and accurately handled. To assist the engineer in this power
system planning, digital computers and highly developed computer programs
are used. Such programs include power-flow, stability, short-circuit, and transients programs.
Power-flow programs compute the voltage magnitudes, phase angles, and
transmission-line power flows for a network under steady-state operating conditions. Other results, including transformer tap settings and generator reactive
power outputs, are also computed. Today’s computers have su‰cient storage
and speed to e‰ciently compute power-flow solutions for networks with
100,000 buses and 150,000 transmission lines. High-speed printers then print
out the complete solution in tabular form for analysis by the planning engineer. Also available are interactive power-flow programs, whereby power-flow
results are displayed on computer screens in the form of single-line diagrams;
the engineer uses these to modify the network with a mouse or from a keyboard and can readily visualize the results. The computer’s large storage and
high-speed capabilities allow the engineer to run the many di¤erent cases necessary to analyze and design transmission and generation-expansion options.
Stability programs are used to study power systems under disturbance
conditions to determine whether synchronous generators and motors remain
in synchronism. System disturbances can be caused by the sudden loss of a
generator or transmission line, by sudden load increases or decreases, and by
short circuits and switching operations. The stability program combines
power-flow equations and machine-dynamic equations to compute the angular swings of machines during disturbances. The program also computes critical clearing times for network faults, and allows the engineer to investigate
the e¤ects of various machine parameters, network modifications, disturbance types, and control schemes.
Short-circuits programs are used to compute three-phase and line-toground faults in power system networks in order to select circuit breakers for
fault interruption, select relays that detect faults and control circuit breakers,
and determine relay settings. Short-circuit currents are computed for each
relay and circuit-breaker location, and for various system-operating conditions such as lines or generating units out of service, in order to determine
minimum and maximum fault currents.
Transients programs compute the magnitudes and shapes of transient overvoltages and currents that result from lightning strikes and line-switching operations. The planning engineer uses the results of a transients program to determine insulation requirements for lines, transformers, and other equipment, and to
select surge arresters that protect equipment against transient overvoltages.
Other computer programs for power system planning include relaycoordination programs and distribution-circuits programs. Computer programs for generation-expansion planning include reliability analysis and
loss-of-load probability (LOLP) programs, production cost programs, and
investment cost programs.
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 23)
SECTION 1.4 COMPUTERS IN POWER SYSTEM ENGINEERING 23
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
1.5
POWERWORLD SIMULATOR
PowerWorld Simulator (PowerWorld) version 15 is a commercial-grade power
system analysis and simulation package that accompanies this text. The purposes
of integrating PowerWorld with the text are to provide computer solutions to examples in the text, to extend the examples, to demonstrate topics covered in the
text, to provide a software tool for more realistic design projects, and to provide
the readers with experience using a commercial grade power system analysis
package. To use this software package, you must first install PowerWorld, along
with all of the necessary case files onto your computer. The PowerWorld software and case files can be downloaded by going to the www.powerworld.com/
GloverSarmaOverbye webpage, and clicking on the DownLoad PowerWorld
Software and Cases for the 5th Edition button. The remainder of this section provides the necessary details to get up and running with PowerWorld.
EXAMPLE 1.1 Introduction to PowerWorld Simulator
After installing PowerWorld, double-click on the PW icon to start the program. Power system analysis requires, of course, that the user provide the program with a model of the power system. With PowerWorld, you can either
build a new case (model) from scratch or start from an existing case. Initially,
we’ll start from an existing case. PowerWorld uses the common Ribbon user
interface in which common commands, such as opening or saving a case, are
available by clicking on the blue and white PowerWorld icon in the upper lefthand corner. So to open a case click on the icon and select Open Case. This
displays the Open Dialog. Select the Example 1.1 case in the Chapter 1 directory, and then click Open. The display should look similar to Figure 1.6.
For users familiar with electric circuit schematics it is readily apparent
that Figure 1.6 does NOT look like a traditional schematic. This is because
the system is drawn in what is called one-line diagram form. A brief explanation is in order. Electric power systems range in size from small dc systems
with peak power demands of perhaps a few milliwatts (mW) to large continentspanning interconnected ac systems with peak demands of hundreds of Gigawatts (GW) of demand (1 GW ¼ 1 ! 109 Watt). The subject of this book and
also PowerWorld are the high voltage, high power, interconnected ac systems. Almost without exception these systems operate using three-phase ac
power at either 50 or 60 Hz. As discussed in Chapter 2, a full analysis of an
arbitrary three-phase system requires consideration of each of the three phases.
Drawing such systems in full schematic form quickly gets excessively complicated. Thankfully, during normal operation three-phase systems are usually
balanced. This permits the system to be accurately modeled as an equivalent
single-phase system (the details are discussed in Chapter 8, Symmetrical Components). Most power system analysis packages, including PowerWorld,
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 24)
24 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
use this approach. Then connections between devices are then drawn with a
single line joining the system devices, hence the term ‘‘one-line’’ diagram.
However, do keep in mind that the actual systems are three phase.
Figure 1.6 illustrates how the major power system components are represented in PowerWorld. Generators are shown as a circle with a ‘‘dog-bone’’
rotor, large arrows represent loads, and transmission lines are simply drawn
as lines. In power system terminology, the nodes at which two or more devices join are called buses. In PowerWorld thicker lines usually represent
buses; the bus voltages are shown in kilovolts (kV) in the fields immediately
to the right of the buses. In addition to voltages, power engineers are also
concerned with how power flows through the system (the solution of the
power flow problem is covered in Chapter 6, Power Flows). In PowerWorld,
power flows can be visualized with arrows superimposed on the generators,
loads, and transmission lines. The size and speed of the arrows indicates the
direction of flow. One of the unique aspects of PowerWorld is its ability to
animate power systems. To start the animation, select the Tools tab on the
Ribbon and then click on the green and black arrow button above Solve (i.e.,
the ‘‘Play’’ button). The one-line should spring to life! While the one-line is
being animated you can interact with the system. Figure 1.6 represents a simple power system in which a generator is supplying power to a load through a
16 kV distribution system feeder. The solid red blocks on the line and load
represent circuit breakers. To open, a circuit breaker simply click on it. Since
the load is series connected to the generator, clicking on any of the circuit
FIGURE 1.6
Example power system
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 25)
SECTION 1.5 POWERWORLD SIMULATOR 25
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
breakers isolates the load from the generator resulting in a blackout. To restore the system click again on the circuit breaker to close it and then again
select the button on the Tools ribbon. To vary the load click on the up or
down arrows between the load value and the ‘‘MW’’ field. Note that because
of the impedance of the line, the load’s voltage drops as its value is increased.
You can view additional information about most of the elements on the
one-line by right-clicking on them. For example right-clicking on the generator
symbol brings up a local menu of additional information about the generator,
while right-clicking on the transmission line brings up local menu of information
about the line. The meaning of many of these fields will become clearer as you
progress through the book. To modify the display itself simply right-click on a
blank area of the one-line. This displays the one-line local menu. Select Oneline
Display Options to display the Oneline Display Options Dialog. From this dialog you can customize many of the display features. For example, to change the
animated flow arrow color select the ‘‘Animated Flows’’ from the options shown
on the left side of the dialog. Then click on the green colored box next to the
‘‘Actual MW’’ field (towards the bottom of the dialog) to change its color.
There are several techniques for panning and/or zooming on the oneline. One method to pan is to first click in an empty portion of the display
and then press the keyboard arrow keys in the direction you would like to
move. To zoom just hold down the Ctrl key while pressing the up arrow to
zoom in, or the down arrow to zoom out. Alternatively you can drag the
one-line by clicking and holding the left mouse button down and then moving the mouse–the one-line should follow. To go to a favorite view from the
one-line local menu select the Go To View to view a list of saved views.
If you would like to retain your changes after you exit PowerWorld you
need to save the results. To do this, select the PowerWorld icon in the upper left
portion of the Ribbon and then Save Case As; enter a di¤erent file name so as
to not overwrite the initial case. One important note: PowerWorld actually
saves the information associated with the power system model itself in a di¤erent file from the information associated with the one-line. The power system
model is stored in *.pwb files (PowerWorld binary file) while the one-line display information is stored in *.pwd files (PowerWorld display file). For all the
cases discussed in this book, the names of both files should be the same (except
the di¤erent extensions). The reason for the dual file system is to provide flexibility. With large system models, it is quite common for a system to be displayed using multiple one-line diagrams. Furthermore, a single one-line diagram
might be used at di¤erent times to display information about di¤erent cases. 9
EXAMPLE 1.2 PowerWorld Simulator—Edit Mode
PowerWorld has two major modes of operations. The Run Mode, which was
just introduced, is used for running simulations and performing analysis. The
Edit Mode, which is used for modifying existing cases and building new
cases, is introduced in this example. To switch to the Edit Mode click on the
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 26)
26 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Edit Mode button, which is located in the upper left portion of the display
immediately below the PowerWorld icon. We’ll use the edit mode to add an
additional bus and load as well as two new lines to the Example 1.1 system.
When switching to the Edit Mode notice that the Ribbon changes slightly,
with several of the existing buttons and icons disabled and others enabled. Also,
the one-line now has a superimposed grid to help with alignment (the grid can
be customized using the Grid/Highlight Unlinked options category on the Oneline Display Options Dialog). In the Edit Mode, we will first add a new bus to
the system. This can be done graphically by first selecting the Draw tab, then
clicking on the Network button and selecting Bus. Once this is done, move the
mouse to the desired one-line location and click (note the Draw tab is only
available in the Edit Mode). The Bus Options dialog then appears. This dialog
is used to set the bus parameters. For now leave all the bus fields at their default
values, except set Bus Name to ‘‘Bus 3’’ and set the nominal voltage to 16.0;
note that the number for this new bus was automatically set to the one greater
than the highest bus number in the case. The one-line should look similar to
Figure 1.7. You may wish to save your case now to avoid losing your changes.
By default, when a new bus is inserted a ‘‘bus field’’ is also inserted. Bus
fields are used to show information about buses on the one-lines. In this case
the new field shows the bus name, although initially in rather small fonts. To
change the field’s font size click on the field to select it, and then select the
Format button (on the Draw Ribbon) to display the Format dialog. Click on
the Font tab and change the font’s size to a larger value to make it easier to see.
FIGURE 1.7
Example 1.2—Edit
Mode view with new bus
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 27)
SECTION 1.5 POWERWORLD SIMULATOR 27
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
You can also change the size of the bus itself using the Format dialog, Display/
Size tab. Since we would also like to see the bus voltage magnitude, we need to
add an additional bus field. On the Draw ribbon select Field, Bus Field, and
then click near bus 3. This displays the Bus Field Options dialog. Make sure the
bus number is set to 3, and that the ‘‘Type of Field’’ is Bus Voltage. Again, resize with the Format, Font dialog.
Next, we’ll insert some load at bus 3. This can be done graphically by
selecting Network, Load, and then clicking on bus 3. The Load Options dialog appears, allowing you to set the load parameters. Note that the load was
automatically assigned to bus 3. Leave all the fields at their default values,
except set the orientation to ‘‘Down,’’ and enter 10.0 in the Constant Power
column MW Value field. As the name implies, a constant power load treats
the load power as being independent of bus voltage; constant power load
models are commonly used in power system analysis. By default PowerWorld
‘‘anchors’’ each load symbol to its bus. This is a handy feature when changing a drawing since when you drag the bus the load and all associated fields
move as well. Note that two fields showing the load’s real (MW) and reactive
(Mvar) power were also auto-inserted with the load. Since we won’t be needing the reactive field right now, select this field and then select click Delete
(located towards the right side of the Tools Ribbon) to remove it. You should
also resize the MW field using the Format, Font command.
Now we need to join the bus 3 load to the rest of the system. We’ll do
this by adding a line from bus 2 to bus 3. Select Network, Transmission Line
and then click on bus 2. This begins the line drawing. During line drawing
PowerWorld adds a new line segment for each mouse click. After adding
several segments place the cursor on bus 3 and double-click. The Transmission Line/Transformer Options dialog appears allowing you to set the line
parameters. Note that PowerWorld should have automatically set the ‘‘from’’
and ‘‘to’’ bus numbers based upon the starting and ending buses (buses 2
and 3). If these values have not been set automatically then you probably did
not click exactly on bus 2 or bus 3; manually enter the values. Next, set the
line’s Series Resistance (R) field to 0.3, the Series Reactance (X) field to 0.6,
and the MVA Limits Limit (A) field to 20 (the details of transformer and
transmission line modeling is covered in Chapters 3 through 5). Select OK to
close the dialog. Note that Simulator also auto-inserted two circuit breakers
and a round ‘‘pie chart’’ symbol. The pie charts are used to show the percentage loading of the line. You can change the display size for these objects
by right-clicking on them to display their option dialogs. 9
EXAMPLE 1.3 PowerWorld Simulator—Run Mode
Next, we need to switch back to Run Mode to animate the new system developed in Example 1.2. Click on the Run Mode button (immediately below
the Edit Mode button), select the Tools on the ribbon and then click the green
and black button above Solve to start the simulation. You should see the
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 28)
28 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
arrows flow from bus 1 to bus 2 to bus 3. Note that the total generation is now
about 16.2 MW, with 15 MW flowing to the two loads and 1.2 MW lost to the
wire resistance. To add the load variation arrows to the bus 3 load right click
on the load MW field (not the load arrow itself) to display the field’s local
menu. Select Load Field Information Dialog to view the Load Field Options
dialog. Set the ‘‘Delta per Mouse Click’’ field to ‘‘1.0,’’ which will change the
load by one MW per click on the up/down arrows. You may also like to set
the ‘‘Digits to Right of Decimal’’ to 2 to see more digits in the load field. Be
sure to save your case. The new system now has one generator and two loads.
The system is still radial, meaning that a break anywhere on the wire joining
bus 1 to bus 2 would result in a blackout of all the loads. Radial power systems are quite common in the lower voltage distribution systems. At higher
voltage levels, networked systems are typically used. In a networked system,
each load has at least two possible sources of power. We can convert our system to a networked system simply by adding a new line from bus 1 to bus 3.
To do this switch back to Edit Mode and then repeat the previous line insertion process except you should start at bus 1 and end at bus 3; use the same
line parameters as for the bus 2 to 3 line. Also before returning to Run Mode,
right click on the blue ‘‘Two Bus Power System’’ title and change it to ‘‘Three
Bus Power System.’’ Return to Run Mode and again solve. Your final system
should look similar to the system shown in Figure 1.8. Note that now you can
open any single line and still supply both loads—a nice increase in reliability!
FIGURE 1.8
Example 1.3—new
three-bus system
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 29)
SECTION 1.5 POWERWORLD SIMULATOR 29
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
With this introduction you now have the skills necessary to begin using
PowerWorld to interactively learn about power systems. If you’d like to take
a look at some of the larger systems you’ll be studying, open PowerWorld
case Example 6.13. This case models a power system with 37 buses. Notice
that when you open any line in the system the flow of power immediately redistributes to continue to meet the total load demand. 9
REFERENCES
1. H. M. Rustebakke et al., Electric Utility Systems Practice, 4th ed. (New York: Wiley,
1983). Photos courtesy of Westinghouse Historical Collection.
2. U.S. Energy Information Administration, Existing Capacity by Energy Source—2008,
www.eia.gov.
3. U.S. Energy Information Administration, Annual Energy Outlook 2010 Early Release
Overview, www.eia.gov.
4. Wikipedia Encyclopedia, List of HVDC Projects, en.wikipedia.org.
5. M.P. Bahrman and B.K. Johnson, ‘‘The ABCs of HVDC Transmission Technologies,’’ IEEE Power & Energy Magazine, 5,2 (March/April 2007), pp. 33–44.
6. Edison Electric Institute, About the Industry, www.eei.org.
7. North American Electric Reliability Council (NERC), 2009 Long-Term Reliability
Assessment (Princeton, NJ: www.nerc.com, October 2009).
8. C.E. Root, ‘‘The Future Beckons,’’ Supplement to IEEE Power & Energy Magazine,
4,3 (May/June 2006), pp. 58–65.
9. E. Santacana, G. Rackli¤e, L. Tang & X. Feng, ‘‘Getting Smart,’’ IEEE Power &
Energy Magazine, 8,2 (March/April 2010), pp. 41–48.
10. North American Electric Reliability Council (NERC), About NERC (Princeton, NJ:
www.nerc.com).
11. T.J. Overbye and J. Weber, ‘‘Visualizing the Electric Grid’’, IEEE Spectrum, 38,2
(February 2001), pp. 52–58.
(AutoPDF V7 10/12 12:22) Thomson-U (7.375×9.25″) Tmath&GillSans J-1711 Glover AC1:(CKN)3/4/2007 pp. 1–30 25795_01_ch01_p001-030 (p. 30)
30 CHAPTER 1 INTRODUCTION
Copyright 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.